罗生 0107.png

Carlin Style Gold Mining Project

In the high-sulfur and high-arsenic Carlin-type sulfide gold project in China, 90% of the gold is enclosed in pyrite. The ore is ground to a particle size of -0.45mm and is subjected to F13 spiral roughing. The gold concentrate yield is 17%, the gold grade is up graded from 0.89ppm to 4.4ppm (enriched 5 times), the recovery rate is 87.11%, and 83% of the tailings are successfully pre-discarded, which reduces the cost of subsequent flotation reagents.

鞍山型红矿项目.jpg

Hematite Cleaner Project

The magnetic concentrate of hematite high gradient strong magnetic separator was proceed with particle size of 150 mesh (0.1mm) in recleaner by type H8 spiral concentrator. The results are shown in the following table.

最新 流程图.jpg

Beach sand heavy minerals project

In Beach sand heavy mineral wet concentrate plant (WCP) projects, by F13 and L5 spirals, the recovery of Zircon and Titanium in first rougher stage,is over 98% When the concentrate yield in 20% w/w.

锡矿2.jpg

Tin Mine Project

For tin ore beneficiation, type F13 spiral concentrator outperforms traditional wet shaking tables and can recover fine particles (800 mesh, 0.019mm) of tin ore that escape from wet shaking table tailings, thereby improving resource utilization.

Scheelite Tailling recycle Project

By ALICOCO’s type F spiral in rougher and type H spiral in scavenger to processing scheelite tailings, it has reduced the tungsten grade of the tailings from 0.12% to 0.018%, and the tungsten concentrate recovery rate has reached 81.68%, exceeding the recovery rate of the flotation process.

img

Chromite Project

In South Africa, chromite recycle from platinum tailings with a particle size of -0.038mm,could up grade the chromite till 48% and platinum was also enriched to 2 ppm+.

img

Copper Ore Project

In a malachite (a type of copper oxide ore) raw ore project in Zambia, aiming at the low-grade raw ore with a copper grade of only 0.4%, the spiral gravity separation process was adopted for pre-enrichment operation. This process achieves efficient separation by virtue of the difference in mineral density, effectively removes gangue impurities, and finally increases the copper grade of the roughly separated malachite concentrate to 5.2%.

img

Quartz Sand Project

The F8 spiral is used to process quartz sand, achieving a quartz sand concentrate yield of 80%, with impurities of iron and titanium <300ppm and a silicon content of 99.96%. It is also very effective in removing mica flakes from high-purity quartz sand.

img

Coal-Fired Desulfurization Project

The mainstream wet and dry desulfurization methods in power plants are post-combustion desulfurization, which has problems like large investment, high costs and difficult operation & maintenance. The innovative pre-combustion solution: wash coal with M5 type spiral machines for desulfurization after coal grinding, while recovering pyrite and ash; the calorific value of refined coal powder increases by 30%, and fly ash storage yards are reduced by 70%.

img
Inquiry Now.
We are committed to producing the best quality food at the most competitive prices.